Brewery Line Trail

Prepared conceptual through construction plans for approx. 600 LF asphalt and concrete trail with sidewalk connections to existing concrete overlook, new steel overlook shelter, concrete stairs with railings, accessible route ramps, light poles, rain gardens, landscaping, musical play instruments, and various amenities such as benches, trash receptacles, and signage. Performed as a prime consultant on the project w/ sub-consulting electrical and civil design work. Construction is expected to begin in fall 2020.

Services Provided:

Site Analysis, Schematic / Concept Design, Master Planning, Construction Documents, Construction Administration

Details

Location: Rochester, NY

Client: City of Rochester

Project to be Completed: 2020-2021

Project Construction Budget: $1 mil.

Roc the Riverway Funding

Partially funded by State of NY (DOS)

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s