Prepared conceptual through construction plans for approx. 600 LF asphalt and concrete trail with sidewalk connections to existing concrete overlook, new steel overlook shelter, concrete stairs with railings, accessible route ramps, light poles, rain gardens, landscaping, musical play instruments, and various amenities such as benches, trash receptacles, and signage. Performed as a prime consultant on the project w/ sub-consulting electrical and civil design work. Construction is expected to begin in fall 2020.
Services Provided:
Site Analysis, Schematic / Concept Design, Master Planning, Construction Documents, Construction Administration
Details
Location: Rochester, NY
Client: City of Rochester
Project to be Completed: 2020-2021
Project Construction Budget: $1 mil.
Roc the Riverway Funding
Partially funded by State of NY (DOS)